Photos
President of Ukraine Petro Poroshenko during the ceremony of the completion of the process of installing Arch over the Shelter object Chernobyl nuclear power plant, in Chernobyl, Ukraine, November 29, 2016. Photo: Mykhailo Palinchak / press service of President of Ukraine / DYVYS / NOT FOR COMMERCIAL USE
Petro Poroshenko delivers a speech
Photos:
Keywords: Chernobyl nuclear power station, economy, full length, horizontal, nuclear power plant, Petro Poroshenko, president
Photosession: Participation of the President in the ceremony of completion of the installation process of the Arch on the object Shelter Chernobyl, 11/29/2016 (38 items)
Category: People, Politics
Photo #: #33245
Location: UKR / Kievskaya / Chornobyl
Date: 29.11.2016
Author: Mykhailo Palinchak
Source:
Direct link to http://dyvys.in is necessary if you use free access photos
maximal size: 3189*2117px / JPG: 1.2 MB / TIFF: 19.3 MB
maximal size for resolution 300 dpi: 6751113 30cm-20cm
access type: free

This photo is freely available for all except agencies. If an agency wants to use the photo, his representatives should contact with the marketing department DYVYS.in.

Using photos is authorized provided the direct open for search engines (indexed) a hyperlink to a page and or direct links www.dyvys.in. The font size should not be less than 90% of the article text and 90% of contrast.

				
							рекламный блок